Garages, shops, pole barns, horse barns and barndominiums, built by a Delaware post-frame builder across New Castle County: Middletown, Odessa, Townsend, Bear, Glasgow, Newark, Hockessin, Pike Creek and Delaware City. New Castle has the strictest suburban rules in the state, and we handle the county permit for you, including the site plan it asks for.
IllustrativeWhy post-frame in New Castle County
On a suburban lot, a building has to meet the rules and look right next to the house. A wood post-frame garage takes the same siding, trim and colors as a home, so it can match yours, and we size it to New Castle's footprint and height limits before the design is final. Inside, the all-wood frame insulates and takes drywall, so a shop can be as comfortable as the house.
IllustrativeWhat we build
From a two-car garage to a barndominium, every building is custom, framed in wood and sized to how you'll use it. Here's how each one works in New Castle County.
Garages & Shops
Detached garages and shops that match the house, sized to New Castle's footprint and height limits before the design is final.
See How We Build ItRV & Boat Storage
RV and boat garages with the door height the rig needs. In New Castle, any building that can hold a vehicle needs a permit.
See How We Build ItFlex & Commercial
Flex space and contractor shops in unincorporated New Castle County, built to the 2024 IBC.
See How We Build ItAgricultural & Poultry
Barns and equipment buildings for working farms, through the county's Certificate of Agricultural Use.
See How We Build ItHorse Barns & Arenas
Private horse barns with stalls, Dutch doors and ventilation, on lots of 2 acres or more and 50 ft from every property line.
See How We Build ItBarndominiums
A home and a shop under one roof, built to the 2024 IRC by a licensed Delaware home builder.
See How We Build ItAccessory Dwelling Units
ADUs on lots of half an acre and up, with the owner on site and one of the two units rentable.
See How We Build It- Permit needed
- Anything that can hold a vehicle, at any size
- Frost depth
- 32 in
- Building code
- 2024 IRC and IBC, since January 1, 2026
- Design loads
- 25 psf snow, 115 mph wind
The permit
Yes. In unincorporated New Castle County, only sheds of 200 sq ft or less with low eaves skip a permit. Garages, and anything that can hold a vehicle, need one at any size, and buildings of 480 sq ft or more also need a sealed lines-and-grades plan. Ashburn handles the plans and the application.
- 1
Lines-and-grades plan
Buildings of 480 sq ft or more need a lines-and-grades plan signed and sealed by a Delaware-licensed engineer or surveyor. Smaller buildings can use a sealed plot survey.
- 2
Online application
The permit application and plans go to the Department of Land Use online. Zoning review is part of the building permit, so setbacks and size limits are checked at the same time.
- 3
Stormwater, when the site needs it
Disturbing 5,000 sq ft of ground or more needs a sediment and stormwater plan. In unincorporated New Castle County the Department of Land Use reviews it; inside most towns the New Castle Conservation District does.
- 4
Inspections
County inspectors check the footings, the foundation, the framing, the close-in and the final. Inspections are booked online, and electrical work is inspected by a state-licensed third-party agency.
- 5
Driveway
Adding or moving an entrance onto a state road needs a DelDOT entrance permit or a DelDOT letter with the building permit.
Inside town limits
The county code covers unincorporated New Castle County. Wilmington, Newark, Middletown, Townsend, Odessa, Delaware City, Elsmere and the City of New Castle handle their own building permits, and Middletown requires a permit for a shed of any size. In Ardentown and Ardencroft the county issues the permit with town approval. We check which applies to your address before we draw anything.
Towns we build in
Middletown · Odessa · Townsend · Bear · Glasgow · Newark · Hockessin · Pike Creek · Delaware City
Farm buildings
Agricultural buildings are exempt from the New Castle County building code when they are necessary to a working farm and the property is used only for agriculture. The building has to produce crops or animals for sale and can't be anyone's home.
Instead of a building permit, the owner applies for a Certificate of Agricultural Use with a plot plan, scaled building plans, and a sediment and stormwater approval.
Homes on farms are not exempt: a barndominium on farmland needs a normal building permit.
Building in New Castle County
- Frost depth
- 32 in
- Footings
- The county raised the minimum concrete footing thickness from 6 in to 8 in
- Post-frame details
- No separate post-frame section; post embedment follows the engineered design reviewed with the plans
- Design loads
- 25 psf ground snow, 115 mph wind
- Flood zones
- A floodplain permit with the building permit; 18 in of freeboard above base flood elevation
- Stormwater
- Plan required at 5,000 sq ft of disturbance or more
Setbacks and size
- Accessory buildings go in the rear yard, at least 3 ft from the side and rear lines, and never in a side yard setback.
- On lots under 2 acres, no freestanding accessory building in front of the house.
- Accessory buildings can cover no more than 30% of the required rear yard.
- On lots under 1 acre, an accessory building can't be bigger than the house's footprint. Maximum height is 20 ft, or as tall as the house on lots over 1 acre if the building is outside all setbacks.
- A private horse barn needs a lot of at least 2 acres and 50 ft from every property line. The county doesn't enforce HOA or deed restrictions, so check yours early.
Accessory dwelling units
One ADU per single-family lot is allowed, inside the home, attached, or detached on lots of half an acre or more. The owner lives in one of the two units, only one of the two can be rented, and a detached ADU meets the same setbacks as the house.
Design-first path
Set the size, add the doors and options, and watch your building come together. When you're ready, bring your design to your free detailed quote, and we'll work out the New Castle County permit with you.
Scheduled like a house
We schedule a building the way we schedule a house: every trade booked before we break ground, named contacts with real cell numbers, and a call from us before you ever have to call. When it’s done, we walk the finished building with you.
Before you ask
Sources
Checked against county and state sources on November 17, 2026. Codes and fees change, so the county has the final word. We confirm the rules for your parcel during the free site visit.
- New Castle County: figure out what permits you need
- New Castle County Code, Chapter 6 (building code)
- New Castle County Unified Development Code, Article 3 (accessory uses, ADUs, stables)
- New Castle County adopted codes
- New Castle County agricultural use requirements
- New Castle County building inspections
- New Castle County fees and municipal services
- DNREC sediment and stormwater delegated agencies
- DelDOT entrance permit FAQs
Building in New Castle County
Tell us what you want to build and where. We'll walk your site, check the New Castle County rules for your parcel, and give you a free detailed quote.
