Ashburn builds pole barns, garages, shops, horse barns, farm buildings and barndominiums across all of Delaware, with our home base in Kent County, and on Maryland’s Eastern Shore. Every county writes its own permit rules, and we handle them for you.
By county
Side by side
| Kent | Sussex | New Castle | |
|---|---|---|---|
| Building code | 2018 IRC and IBC, with post-frame sections | 2021 IRC and IBC | 2024 IRC and IBC |
| Garages and pole buildings | Permit at any size | Permit for every building | Permit for anything that can hold a vehicle |
| Footing depth | Posts at least 40 in deep | Posts at least 36 in deep, deeper over 12 ft | 32 in frost depth |
| Farm buildings | Agricultural building use permit (5+ acres) | County permit, final zoning inspection only | Certificate of Agricultural Use |
| Inside town limits | 9 towns run their own permits | County permit applies everywhere | Wilmington, Newark, Middletown and other towns run their own |
| ADUs | Up to 50% of the house, owner on site | Up to 1,000 sq ft, staff approval | Detached on half an acre or more, owner on site |
No statewide building code
Delaware lets each county adopt its own code, and many towns run their own permits. The same building can face different rules a few miles apart.
Stormwater at 5,000 sq ft
Disturbing 5,000 sq ft of ground or more needs a sediment and stormwater plan. Most single buildings that cross that line use a simpler standard plan.
DelDOT for new entrances
A new or changed driveway onto a state-maintained road needs a DelDOT entrance permit, and the county may ask for it before the final inspection.
Design-first path
Set the size, add the doors and options, and watch your building come together. When you're ready, bring your design to your free detailed quote, and we'll check your county's rules with you.
Scheduled like a house
We schedule a building the way we schedule a house: every trade booked before we break ground, named contacts with real cell numbers, and a call from us before you ever have to call. When it’s done, we walk the finished building with you.
Before you ask
Sources
Checked against county and state sources on November 17, 2026. Codes and fees change, so the county has the final word. We confirm the rules for your parcel during the free site visit.
Wherever your land is
Tell us what you want to build and where. We'll walk your site, check your county's rules, and give you a free detailed quote.
